Industrial Project: Grid-Tied Solar System with Robotic Cleaning
Scope
On-Grid Systems Installation
Location
Jeddah
Capacity
1.2 MWp
Project Overview
A grid-connected solar system for an industrial facility in Jeddah, featuring high-efficiency panels and an innovative robotic cleaning system to ensure maximum performance. This project successfully reduces the facility’s energy costs and provides a sustainable energy solution while maintaining panel efficiency year-round.
